The 2nd floor construction
It has been a long time since I last posted here. A lot of things happened in my life that I failed to post here on a daily basis. I can say that those experiences were an eye opener, mind boggling and physically demanding but it was both rewarding and marvelling in the end. I am a bit disappointed because of the external appearance of our underconstructed house.
The construction of the 2nd floor of the house started on the last week of March. Surprisingly, it was over designed. Approximately P60,000 were spent on the 6 beams plus weekly wage already. It was depressing and annoying that it occurred. My mother was in dismay over the said news and she did a few adjustments for us to live comfortably in our house partially without a roof. My heart was so over it and I only shutted my mouth before I say anything sarcastic. Currently, the temperature in the ground floor where I do computer jobs was good and it is no longer very hot. The 2nd floor improved extremely well but the thing that worries me the most is when it rains. It will definitely flood the ground floor therefore no area for sleep. We’re lucky its summer and rainy days are less likely.
I wish this construction will be done as soon as possible. The longer the duration the costlier it gets. This will be my official post for the day. May God forbids to rain.
Have a pleasant day!
![]()